**DATA**VOICE**ELECTRICAL**TELECOMMUNICATIONS**

**CABLING**NETWORKS**DATA CENTRES**
**TELCO INFRASTRUCTURE**
“Specialists to the Communications Industry”
more REFERENCE SITES
Melbourne Girls Grammar School
Design & construction of a main communications room including raised floor.
Installation and certification of (1,050) UTP field outlets.
Installation and certification of a 1km 12core single mode fiber between campuses.
Installation of (500) Double GPO’s (including switchboard upgrades)
Warwick  Fabrics  -  (Australia wide)
Installation of over (200) UTP field outlets
Convert existing cabling infrastructure to a fully patchable system.
Ongoing day to day installation works.
ANZ Bank  -  (Vic.)  /  (NSW)
Stock Exchange - Installation of dealers’ consoles, Air Blown Fiber & over (1,000) UTP field outlets.
Y2K test environment - comprising Fiber and UTP cabling.
Nortel Passport 4400 installation - members of staff involved with the cut-over for Voice / Data dial ups for internet switching through Cisco Routers internationally in places such as; Asia Pacific region, Fiji, Vanuatu, Western Samoa, Vietnam, Jakarta, Indonesia, Dubai.
RAAF - LEARMONTH (Exmouth W.A) and EAST  SALE (Vic.)
Install, Terminate and Test over 80km of Optical Fibre.
Install over 40km of “pit & pipe” cable pathways.
Install over (80) communication cabinets.
Install, Terminate and Test over (800) UTP field outlets.
Install Electrical services.
GEC  Marconi  -  Laverton (W.A)  /  Longreach (Qld)
Jindalee (Over The Horizon Radar) project.
Install “pit & pipe” cable pathways.
Install, Terminate and Test Optical Fiber, UTP, & RF co-axial cable.
Install over (200) communication cabinets.
Install major tray and duct cable support systems.
Install Electrical services.
Grove Group  -  (Australia wide)
Tarrengower Correctional facility - 16 bed unit
Barwon Prison (stage 1 & 2) - 2 X 52 bed units
MATV
Security
Electrical including HV upgrades
Data, Voice and Optical Fiber backbone
Pit and Pipe